Things are happening fast these days.
Here are the most recent pictures from Thursday evening (November 20) ...
The ramp has finally been poured. There are at least four heaters in the tarp tent (right side of picture, obscuring the front door) helping the concrete dry!
The carpet is on the stairs:
Sinks, toilets, faucets, shower heads...etc, all installed:
Closets have shelves and rods (This is the closet in my office in the basement):
My office... notice the laminate flooring:
The backsplash in the kitchen has been installed:
The lights on the back deck:
It's unbelievable. We've been waiting for so long, and now it is so close to completion! I really can't wait to move-in, and yet it is going to be such a busy week. Maybe the next time I post something, I will be in the new house! WOW!
Saturday, November 22, 2008
Thursday, November 20, 2008
Nov. 15 Tiles, upstairs flooring and more!
Here's my regular shot! Quite a change from the first picture I ever took of this lot! Notice that the form for the ramp is starting to go up!
Here is a picture taken from the front door looking to the back of the main floor. You can see the stairs to the basement, part of the living room (the windows on the left) and the kitchen (the island on the right).
The fireplace and ash floors (pre-finished).
The deck with the railings:
The completed tiles (notice the green border for the coloured tiles that wasn't there in the previous picture).
The ovens in the kitchen!
Here is a picture taken from the front door looking to the back of the main floor. You can see the stairs to the basement, part of the living room (the windows on the left) and the kitchen (the island on the right).
The fireplace and ash floors (pre-finished).
The deck with the railings:
The completed tiles (notice the green border for the coloured tiles that wasn't there in the previous picture).
The ovens in the kitchen!
Tuesday, November 11, 2008
Nov. 11 - Fireplace, Fixtures and Flooring
Nov. 2 - Trim, paint and more.
Today we brought dear friends to see the house. Each time I see the house I am amazed at the progress.
Here are a bunch of photos:
The trim is starting to go in and is being painted:
Here is Preston and our friends in the basement - Lots of space to run around in!
Here is the furnace, although it is not installed yet. You can see the geothermal pipes in the background running up to a central board:
This is where our wheel-under stove top will go (on the island):
Here you can see the wood railing for our stairs:
This is at the front of the house. You can see the unpainted siding, which will eventually be red. Preston is coming from the back of the house:
Here are a bunch of photos:
The trim is starting to go in and is being painted:
Here is Preston and our friends in the basement - Lots of space to run around in!
Here is the furnace, although it is not installed yet. You can see the geothermal pipes in the background running up to a central board:
This is where our wheel-under stove top will go (on the island):
Here you can see the wood railing for our stairs:
This is at the front of the house. You can see the unpainted siding, which will eventually be red. Preston is coming from the back of the house: