Wednesday, October 29, 2008

Move-in date changed

Our move-in date has changed.
Things are going well, but it seems that the builders don't want to be rushed and there are lots of things to be figured out still.

So now we will be moving in on November 28th and I don't think it will change. But I guess it is still possible to move to an even later date.

I'm going to keep hoping and praying that it doesn't change again. I'm ready to move in.

Sunday, October 26, 2008

October 25th - Driveway and MORE!

The driveway has been poured, the granite countertops are in and the basement is drywalled.
We will (hopefully) be moving in on November 15th and so far everything looks like it is on track.

Here are the most recent pictures:


The driveway:






The granite countertops:




The elevator:




The drywall in the basement:






The stucco on the outside (this is the back of the house, under the deck):

Saturday, October 25, 2008

October 11 - Cabinets and more

So things seem to be happening faster and faster. The pictures below are from two weeks ago when Preston and I showed the house to my brother, his wife, my sister, her husband and their little baby.

The fabulous news is that our move-in date is now NOVEMBER 15! Three weeks from today.





The main bathroom cabinets and countertop:




The kitchen is starting to take shape:






The basement is being framed:





September 25

More and more concrete!

The basement - no walls yet, but the wood is there:






The front porch:

September 21

Wow does time fly. I have been meaning to post for over a month - again!
So I'll add pictures and some commentary.

Things are moving fast these days!

Here are pictures of the house as of September 21:

The basement waiting for the concrete to be poured (Notice the tub/shower hanging from the ceiling):








The living room with the fireplace:




The back deck - taken apart and beginning to be put back together!