Today was another busy house planning day.
We met the builders and the electrician at the house today. It was important that Preston be inside the house for this one and so the builder had the framers build a make-shift (and very steep) ramp. It worked well and it was Preston's first time inside our house. We talked about placement of lights, switches, outlets and the plumbing for the wheel-in shower. The kitchen took the longest as we had to draw out the cabinetry plan and figure out where all the appliances were going to be. It was really fun, but it took over three hours. Here are a few pictures from the afternoon:
Lamp post picture of the front (notice the packages of shingles on the roof - this was delivered today while we were doing the walk-through. The roof may be shingled tomorrow!):
Preston in his framed wheel-in shower:
Drawing the cabinetry on the floor:
A view of the trusses from the inside:
One of the most exciting developments for today was the deck. We could actually go outside and stand on the deck. Preston took this picture while we were figuring out the lighting/electrical for the deck:
On the deck, looking back towards the house. The door on the left goes into the great room and kitchen and the large window on the right is the great room:
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment